Install cable tray support using a pre-fabricated flange or GI channel. The size, length and intervals of the support to be as per the specification, standards, number of cables, and size of the cable.
Fix the cable tray
Lay the cable keeping the distance as per calculation
Tie the cable using cable tie and tagging the cables as required
Earth continuity conductors shall be provided across gaps in all Cable Tray